Product
Introduction
PZ-7 type
gunite machine is a new and efficient wet sprayed concrete construction
equipment. With high efficiency, stable performance, easy operation and
maintenance, the job site adaptability and other characteristics. PZ-7 type
gunite machine consisted of driven electric motor, reducer, rubber elbow, the
rotor body assembly, rubber wheel, seal plate, seat hopper, vibrating hopper,
pressed bodies and accelerator conveyor systems, air duct system and electronic
control devices and other components.
Scope of
application
PZ-7 type
gunite machine is widely used in construction machinery, mines, tunnels,
culverts, subway, hydropower engineering, underground engineering and high
marsh coal mine tunnel shotcrete construction operations: Various types of
industrial furnaces, molding spraying refractory lining or repair: a variety of
green slope, soil transport and injection.The machine can be used for wave
spray can also be used to dry spray and spray job fibers.
Feature
(1)PZ-7-type gunite machine with caster structure, making the
move more convenient.
(2)Through rotor chamber no binder , the material smooth,
efficient and time-saving;
(3)Four point elastic compensation compression, good sealing
effect, little dust next machine,wearing parts with long life ;
(4)Using low pressure high speed vortex air transport, overcome
the bonding of material handling, plugging away from the pack and pulse
problems, material flow uniform, continuous and stable.
(5)New nozzle, discharge elbow device, to improve spray
deposition, less resilient, high quality shotcrete.
(6)Using high-quality wear-resistant lining and high quality
rubber sheet, life greatly improved.
Technical
Parameter
Model PZ-7
Working
capacity 7m 3 /h
Air
pressure 0.4-0.6Mpa
Air
consumption 8-10m 3 /min
Max
aggregate size 20mm
Max
conveying distance wave spray ≤ 200m
Motor
power 7.5kw
Voltage
class 380V,440V,660V,1140V
Outer
size 1300×800×1300mm
usage and
operation method
The operator must read the instruction
manual and are familiar with the machine structure and operating procedures
before induction operation.
1、 The preparation before starting.A, Inspect the connecting
parts are solid, each rotary sliding parts are flexible and reliable. B,
observe the cursor, check the gear box oil is sufficient. C, drive motor and
power connections, move the motor direction of rotation should be observed turn
fonts marked with arrows in the same direction, otherwise the power supply
should be synchronized. D, the main gas line, gas line on the next gas,
pneumatic vibrator, sprinkler water supply shut-off valve in the closed state,
the main gas source tracheal access. Access to water supply pipe, conveying
pipe connected to the host. E, adjust the clamping mechanism, manually
pre-pressed, and then use a wrench to tighten the bend conveying pipe, open the
main gas line shut-off valve on the gas line, observe the pressure gauge at
0.3Mpa around the city, there should be no place rubber flex board gas
overflow.
2、 first open the main gas jet operating road, on the gas
line, the next gas valve, open the water supply shut-off valve nozzle, pre-wet
rock surface, and then start the motor, turn the vibrator pneumatic valves,
mixing materials added to the hopper , began spraying operation. Nozzle
operator should work properly adjusted sprinkler water supply, protect the
material has a suitable water-cement ratio concrete. Host operating personnel
should observe the host side I pores, such as more than material discharged
under should be properly reduced the amount of gas supply. Until the machine I
No material at the discharge port, the device works so far.
3、 stop operation shut down before the first stop feeding,
with no material ejected at the nozzle, turn off the water supply shut-off
valve, while adding a small amount to wet gravel hopper, the hopper and rotor
material times the cavity of the residual material washed away, with no
material ejected at the nozzle, turn off the motor power and the gas shutoff
valve.